, , , , , ,

Fluminer L3 Dogecoin Miner

$3,950.00

Fluminer L3 Dogecoin Miner, 9.5 GH/s, 1700 W, Scrypt. New, tested & verified. Crypto/wire, worldwide shipping.

About the Fluminer L3 Dogecoin Miner

Add the Fluminer L3 Dogecoin Miner to your fleet through The Bitcoin Miners, every unit is bench-tested, powered on and QC-sealed before dispatch.

Hashrate 9.5 GH/s
Algorithm Scrypt
Power draw 1700 W
Efficiency 0.179 J/Mh
SKU Fluminer L3

On paper the Fluminer L3 Dogecoin Miner delivers a rated hashrate of 9.5 GH/s, around 1700 W of power draw, an efficiency of 0.179 J/Mh. Real-world output depends on ambient temperature, firmware, pool and network difficulty, our hashrate & efficiency guide explains how published specs translate to daily results. Mining is not financial advice and profitability is never guaranteed.

Related hardware

Browse more from Dogecoin Miner, Fluminer, Litecoin Miner, Asic Miners. New to mining? Start with how to choose a Bitcoin miner.

Why buy from The Bitcoin Miners

  • Brand-new, tested hardware, no refurbished surprises.
  • Crypto & bank-wire payment with specialist support on large orders.
  • Tracked, insured worldwide shipping with full customs docs.
  • Manufacturer warranty backing and real human support.

Frequently asked questions

Is the Fluminer L3 Dogecoin Miner new?
Yes, we supply brand-new units through authorized manufacturer and distributor channels. Each is inspected and hashrate-verified QC-sealed before dispatch.

How can I pay?
We accept major cryptocurrencies and bank wire for larger orders, with a specialist confirming high-value purchases. See payment & security.

Do you ship worldwide?
Yes, tracked and insured, with full customs documentation. See shipping & delivery.

Is it under warranty?
It carries manufacturer warranty coverage where applicable and we stand behind every unit, see our warranty page.

Ready to deploy the Fluminer L3 Dogecoin Miner?

Talk to a specialist about stock, fleet pricing and lead times.

Talk to a mining specialist

Delivery Time

Jan 2026, Deposit for Fluminer L3

Scroll to Top